Building the Austin 7 Special
 First day of project - collecting the chassis |
---|
 Stripped, sand-blasted, and painted chassis |  Fabricating the floor-pan |  Floor-pan, firewall, and boot flood completed |  Building the plywood body |  Building the plywood body |  Building the plywood body |  Building the plywood body |  Building the plywood body |  Donor from which the seats, electrics, and running gear was removed |  Engine and electrics installed and body fibreglassed |  Engine and electrics installed |  Seats and bonnet fitted |  |  |  |  |  |  Finished paint |  Finished paint |  Finished paint |  |  Bonnet sides fabricated, powder-coated, and fitted. Rear mudguards fitted. |  Fitting front mudguards in Dennis Milne's workshop |  Front mudguards and lights fitted. Windscreens fabricated and fitted. |  Rear lights, number plate bracket, and spare wheel mount completed |  The first proper drive |  The first proper drive |  |  |
---|